2026 Notice on the End of Cooling Operations and Transition to Heating

As the seasons change, please be advised of the following schedule for the changeover, inspection, and operation of the heating and cooling systems at Gwanak Residence Halls     ❑ Operating Schedule End of Cooling Operations Heating/Cooling System Changeover and Inspection Start of Heating Operations Sep. 30, 2026 Oct. 1–31, 2026 Nov. 1, 2026   […]